North Manama Causeway
Works |
Client: MOW -Haji Hassan
Consultant: Hyder Consulting Middle East Ltd
Location: North Manama
Status: Completed
|
|
Description: North Manama
Causeway-Road Access to BFH & Bahrain Business Bay – Supply and Installation of 35 Meter, 16
Meter Street Light Column, Luminaires and Associated Cabling works, Installation of New
Traffic Signals, Relocation of Existing Traffic Signals, Diversion of Existing 7 K.M Long
Batelco Cable. Duct Installation, Laying of Cable, Construction of Manhole & Joining Works,
Supply and installations of deck void lights-3000Nr including 14 KM GI conduit installation.
Supply and installation of under bridge lighting.
|
Mina Salman Interchange
Project |
Client: MOW-Afcons
Consultant: Parsons Global Limited
Location: Mina Salman
Status: Completed
|
|
Description: Associated
complete electrical works, under pass lighting system, under bridge lightings, street
lighting Including 35 m,14 m, 12 m, 10 m poles & Luminaires & Installations of temporary &
permanent traffic system.
|
National Broad Band
Network-12 KM |
Client: Bahrain Internet
Exchange(BIX)
Consultant: Ericsson AB Bahrain
Location: King Fahad Causeway
Status: Completed
|
|
Description: Installation of
micro ducts & draw fiber optic cable including splicing, ODF installation, OTDR & Power
meter testing of King Fahad causeway passive Fiber Network.
|
Bahrain International
Circuit (BIC) Track lighting system |
Client: Cartec / MOW special
projects
Consultant: Tilke& Partners WLL
Location: Bahrain International Circuit, Sakhir
Status: Completed
|
|
Description: Bahrain
International Circuit (BIC) Track Lighting Project – Electrical Works Sub-Contract for: LV
Cable Installation, Termination, Jointing & Testing.
|
View More.. |
Replacement of Sitra Bridge |
Client: Gamuda Berhad
Consultant: Cowi Almoayyed
Location: Um Alhassam and Sitra
Status: Completed
|
|
Description: Laying of cables and water
distribution pipe lines including testing and commissioning, installation of street lighting, traffic
signals and Batelco ducts, and all other associated works. |
Replacement of Sitra Bridge |
Client: Gamuda Berhad
Consultant: Hyder & Cowi Almoayyed Location: Sitra
Status: Completed
|
|
Description: Installation of Intelligent Transportation
Systems and all other associated works. |
Sitra Power Station |
Client: Electricity Transmission Directorate
Consultant: n/a
Location: Um Alhassam and Sitra
Status: Completed
|
|
Description: Replacement of Oil Filled Transmission Cable
with XLPE Cable and all other electrical associated works. |
View More.. |
Bahrain Investment Wharf Master Plan Infrastructure & Labour Accommodation Camp |
Client: Bahrain Investment Wharf
Consultant: Gemac
Location: Hidd
Status: Completed
|
|
Description: Installation and Testing of substations, HV and LV Cable Laying, Jointing, Testing and Commissioning, Installation of Feeder Pillars and street lighting and all associated electrical works. |
Bahrain Investment Wharf Master Plan Infrastructure |
Client: Bahrain Investment Wharf
Consultant: SNC Lavalin
Location: Hidd
Status: Completed
|
|
Description: 66KV Cable Installation, Jointing, termination, testing and all other associated electrical and civil works. |
Government Utility Services |
Client: Water Distribution Directorate
Consultant: n/a
Location: Several locations all over Bahrain including Budaiya, Muharraq & Hidd
Status: Completed
|
|
Description: Replacement of service pipes & extension of mains and all other associated works at several locations. |
Alba Civil, Electrical & IT works |
Client: Alba
Consultant: n/a
Location: Alba
Status: Completed
|
|
Description: Complete renovation, installation of Electrical Distribution Panels, lights, Power Outlets, Electrical Equipments, IT Panels, Outlets, 120KVA UPS Batteries and associated cabling, testing and commissioning, Pot Cut out and Repair Activities, PTA Crane Overhauling, and all other associated civil and electrical works.
|
View More.. |
Electrical Works for Gulf International Bank |
Client: Gulf International Bank
Consultant: Gemac
Location: Juffair
Status: Completed
|
|
Description: Upgrading of the Electric Power Distribution System including supply, installation, modification and all other associated works. |
Government Electrical Engineering services |
Client: Electricity Transmission Directorate
Consultant: ESB International
Location: Riffa and Isa Town
Status: Completed
|
|
Description: 220 KV Cable Laying Works and other associated electrical and civil works. |
Security Systems for Bahrain International Airport |
Client: Civil Aviation Affairs
Consultant: Siemens
Location: Muharraq
Status: Completed
|
|
Description: Installation of Perimeter Security System around the perimeter. |
Illumination of Bahrain Fort, Arad Fort, Riffa Fort, and Bahrain National Museum |
Client: Ministry of Information
Consultant: Gemac
Location: Manama, Arad, Riffa
Status: Completed
|
|
Description: Installation of all illumination requirements for the entire premises, including focus, buried and flood lights and all other associated works. |
View More.. |
Lighting at Bahrain International Airport |
Client: Bahrain International Airport
Consultant: n/a
Location: Muharraq
Status: Completed
|
|
Description: Street lighting & flood lighting maintenance for the duration of 3 years and all other associated works. |
Electrical work for ALBA |
Client: ALBA & Emirates Trading Agency
Consultant: Mott McDonald
Location: Askar
Status: Completed
|
|
Description: 132 KV and 33 KV cable laying works and all other civil and electrical associated works. |
|
|
|
|